2025-06-27
With the improvement of current scientific and technological level, the use of 1000T Hydraulic Deep Drawing Press has become more popular. Many companies specializing in wind power generation, shipbuilding, petrochemical and other industries are using it. The following introduces the installation process and working principle of hydraulic bolt tensioner, hoping to help everyone better understand and use it.
1000T Hydraulic Deep Drawing Press is also called bolt tensioner. It mainly uses the hydraulic source provided by the ultra-high pressure hydraulic pump. The tensile force is determined according to the tensile strength, yield coefficient and elongation of the material, and the tensile force generated by the ultra-high pressure oil pump. In this way, the bolts that have been applied are easily elongated in their elastic deformation zone, resulting in slight deformation of the bolt diameter, which makes the nut easy to loosen. Another use is to use it as a device for applying axial force to the hydraulic interference connection for top pressure installation.
1. Make sure the flange is fastened and close together, and the bolts and nuts are also fixed. Install 50% of the tensioners on the top of the flange. Tighten the nut to tighten it with the tensioner;
2. Make sure that at least one threaded bolt is exposed after installing the tensioner;
3. Make sure the flange is fastened and close together, and the bolts and nuts are also fastened, and install another 50% of the tensioners on the long bolts. Tighten the nut to tighten it with the tensioner;
4. Check the environment around the bottom of the tensioner to ensure that the tensioner acts vertically and horizontally on the contact plane;
5. Install the support ring and hydraulic cylinder with half of the bolts spaced apart as the first group, and turn the starting direction of the support ring to the radial direction of the flange;
6. Check the surroundings of the support ring base to ensure that it has acted vertically on the tensioning plane. By adjusting the load screw at the bottom of the hydraulic cylinder, the support ring can be rotated relative to the hydraulic pressure;
7. After tightening 50% of the support rings on the load nut, the oil pipe connection is usually placed outward with the flange as the center.
8. Install the hydraulic cylinder.
The 1000T Hydraulic Deep Drawing Press is now installed. You can use it for work and production. If you want to consult about this equipment, please feel free to contact Xiamen Taitian Machinery Technology Group Co., Ltd.!